The construction of a primary school

 

Date   August 2017
Region   Praha - Velká Chuchle
Customer sector   public
Purpose of use   Classrooms, locker rooms, a teacher’s office, toilets
Facilities   Residential containers, corridor containers and stairs
Type of project   Sale
Number of modules/m2   20/300

 

The construction of a two-storey assembly which consisted of residential and sanitary containers (with the dimensions 2.5 x 6 m with the indoor height of 3 m) according to a first draft by a designing company was performed in approximately 5 months. The assembly served as a primary school in Velká Chuchle in Prague 5 for 96 children who needed temporary premises because the original building of the school made of bricks was being reconstructed. There are 4 classrooms, a teacher’s office, a locker room, sanitary facilities for children and teachers and a room for cleaning equipment. Several subcontractors took part in the construction and they delivered multi-split air conditioners, steel structures such as outdoor stairs and anchoring structures of air conditioners, a water connection and sewers, water pipes and lightning conductor.







 

ALGECO Service Dame

Máte projekt nebo se chcete dozvědět více o našich řešeních?

Naši odborníci Vám jsou k dispozici od pondělí do pátku, vždy od 8:00 - 17.00 hodin.
 

Zavoláme Vám zpět

Our SERVIS 360°

Equipment – packages


  • Furniture
  • Kitchenettes
  • Sanitary accessories

Technical equipment – packages


  • Networks
  • Communications
  • Air-conditionin

Security – packages


  • Fire detection and alarm systems
  • Security equipment
  • Insurance
  • Maintenance