Date | 3/2018 | |
Region | Praha | |
Customer sector | Building industry | |
Purpose of use | The facilities for a construction site | |
Equipment |
Sanitary modules, office modules, passageways and access stairs |
|
Type of project | Rent / 9 months | |
Number of modules/m2 | 24/354 |
The preparation of a construction site for a construction. The assembly is equipped with sanitary modules, there are changing rooms on the first floor and the second floor is designed for the management of the construction (offices, a meeting room). The second floor of the assembly is accessed from the side stairs and the movement on the second floor is secured by console passageways. Equipment: indoor blinds and air-conditioning units.