| Date | 3/2018 | |
| Region | Praha | |
| Customer sector | Building industry | |
| Purpose of use | The facilities for a construction site | |
| Equipment | 
				 Sanitary modules, office modules, passageways and access stairs  | 
		|
| Type of project | Rent / 9 months | |
| Number of modules/m2 | 24/354 | 
The preparation of a construction site for a construction. The assembly is equipped with sanitary modules, there are changing rooms on the first floor and the second floor is designed for the management of the construction (offices, a meeting room). The second floor of the assembly is accessed from the side stairs and the movement on the second floor is secured by console passageways. Equipment: indoor blinds and air-conditioning units.
        